Brief: Thinking about an upgrade? This short demo helps you evaluate the fit. Watch as we showcase the Wiegand Network Armored Fiber Optic Patch Cable, demonstrating its robust construction, superior ferrule performance, and rigorous testing for demanding B2B networking environments.
Related Product Features:
Features a durable armored construction with metal woven mesh and stainless steel spiral armor for superior rodent, tensile, and compression resistance.
Equipped with a ceramic ferrule for stable data exchange and high plug resistance, supporting over 1000 plugging cycles.
Available with various connector models including SC, FC, LC, and ST to suit different interface requirements.
Offers low insertion loss (≤ 0.35dB) and high return loss (≥ 50dB UPC, ≥ 60dB APC) for efficient data transmission.
Constructed with LSZH (Low Smoke Zero Halogen) sheath for high-temperature resistance and environmental safety.
Supports customizable lengths, colors, and fiber types including G652D, G657A1, and multimode options.
Designed with high flexibility and reinforced joints to prevent breakage during installation and use.
Operates across a wide temperature range (-25°C to +70°C) and maintains performance in various environmental conditions.
FAQs:
What types of connectors are available for this armored fiber optic patch cable?
This patch cable is available with SC, FC, LC, and ST connector models to accommodate various networking interface requirements.
Can this cable be customized according to specific project needs?
Yes, we offer comprehensive customization options including length, color, fiber type, and packaging to meet your specific project requirements.
What are the key protective features of this armored fiber optic cable?
The cable features multi-layer protection including metal woven mesh, aramid reinforcement, and stainless steel spiral armor for exceptional rodent bite resistance, tensile strength, and compression protection.
What is the typical delivery time for orders?
Our standard delivery timeframe is 15 to 20 days, ensuring timely fulfillment for your project schedules.